Power train · cooling envelope · per-rack

Data center monitoring — every rack, every PDU, every CRAH under one operator console.

The chiller plant rebalances at 04:12 and a single CRAH starts climbing two degrees above baseline. Your DCIM sees it; your BMS sees it; your tenant portal does not. Power-train health, cooling envelope, PDU/RPP telemetry and colo-tenant SLA portals — fused into one console for hyperscale, colo and edge operators.

0facilities under monitoring
Uptime + ASHRAEevidence pre-mapped
0% facility uptime target
0day contract-to-first-ingest
The reality at facility scale

The power train fails before the dashboard notices.

78%
outages trace to power
Uptime Institute studies repeatedly put power-train issues at the root of most facility-wide outages.
ΔT 12°F
typical hot/cold aisle delta
ASHRAE TC 9.9 A1 envelope. Drift outside this band is invisible until it hits a rack thermal alarm.
30+
tools per typical facility
BMS, EPMS, DCIM, generator portals, rack-level vendor RMS, leak detection consoles, FM dashboards.

Indicative benchmarks from facility operator interviews and published Uptime Institute studies. Your facility's numbers will differ.

What ships in the first 90 days

Four surfaces tuned for ASHRAE-grade facilities and the operators who run them.

Drop in next to your BMS, EPMS and DCIM — read-only at first, write-scope when the runbooks earn it.

Power train health, edge to PDU.

Utility feed, ATS, UPS strings, switchgear, RPP, PDU and per-rack outlets — one normalised view, one alarm queue.

  • UPS battery profiles + runtime projection · per string
  • ATS transfer telemetry · health, exercise logs, scheduling
  • PDU + RPP outlet-level draw · phase balance alarms
  • Generator readiness · fuel, exercise, emissions logs

Cooling envelope, before it drifts.

CRAH/CRAC, chillers, cooling towers, leak detection — correlated against the ASHRAE envelope and rack-level intake.

  • Per-rack intake temp · ASHRAE class enforcement
  • Chiller plant load balance + ΔT alarms
  • Leak detection + containment integrity monitoring
  • Thermal hotspot forecasting before customer alarm fires

Colo-tenant SLA dashboards, by construction.

Per-tenant power draw, uptime evidence and incident timelines — read-only, time-boxed, dispute-ready.

  • Per-tenant uptime + power · signed, exportable
  • Sub-tenant incident packets with raw event stream
  • Read-only auditor links · time-boxed per tenant

Capacity + thermal forecasting.

Rack power headroom, cooling envelope projection, deployment-readiness — before sales commits a new tenant.

  • Per-rack headroom + projected fill rate
  • Cooling envelope projection at planned load
  • Deployment-readiness checklist · gated to sign-off
An incident, end to end

From a 2°C CRAH drift in Dallas to a sealed EN 50600 entry — without a tenant noticing.

01
DAL-DC-1 · CRAH-4 supply temp + 2°C · trending

CRAH unit drifts.

ObservOne picks up a slow supply-temperature drift on a single CRAH — three consecutive 15-minute samples above baseline, not a single-reading transient.

02
correlation engine

Console correlates.

Chiller plant load balance shifted at 04:12. Cool-aisle baseline restored within 6 minutes. Forecast envelope remains well within ASHRAE A1. No tenant exposure — log the event, no truck.

03
EN 50600 · operations log sealed

Evidence is auto-logged.

Event timeline drafted to EN 50600 operations-log spec. Tenant uptime accounting updated. Q3 facility report now 84% complete; tenant-facing incident note suppressed (sub-second tenant impact).

Audit-ready by construction

Tenant disputes settle on your evidence.

Uptime · Tier
Tier classification
Operations and maintenance evidence aligned with Uptime Institute Tier III / IV criteria.
ASHRAE · TC 9.9
Thermal guidelines
Per-rack intake monitoring + envelope enforcement against ASHRAE classes A1–A4.
EN · 50600
DC information tech
European DC facility operations standard — energy, performance, security and maintenance.
SOC 2 · ISO 27001
Security baseline
Controls mapped for both standards · audit packets generated from live operations.
Hands on

Walk through your facility
in the sandbox.

30 minutes with a solutions engineer. We'll preload a tenant with anonymised facilities matching your topology — UPS vendors, chiller plant layout, tenant mix. NDA-friendly.